2019全程备考二轮复习高三英语“阅读理解+阅读七选五”组合练 (4份打包)

2019-02-14
| 4份
| 26页
| 812人阅读
| 139人下载

资源信息

学段 高中
学科 英语
教材版本 -
年级 高三
章节 -
类型 题集
知识点 -
使用场景 同步教学
学年 2019-2020
地区(省份) 陕西省
地区(市) 咸阳市
地区(区县) -
文件格式 ZIP
文件大小 305 KB
发布时间 2019-02-14
更新时间 2023-04-09
作者 天道酬勤学贵心悟01
品牌系列 -
审核时间 2019-02-14
下载链接 https://m.zxxk.com/soft/9698646.html
价格 0.50储值(1储值=1元)
来源 学科网

内容正文:

第 1 页 共 8 页 “阅读理解+阅读七选五”组合练(一) (限时45分钟) Ⅰ.阅读理解 A (2018·安庆二模) Famous Modern Chinese Buildings Beijing International Airport The first place most visitors see when they arrive in China is Beijing International Airport.The airport was constructed in the 1950s.It has an indoor garden, a children's playground, and over 70 food businesses in Terminal 3 alone. Shanghai World Financial Center Completed in 2008, SWFC took over 10 years to complete due to financial shortages and construction delays.Since its completion, it has won countless architectural awards. Tourists are welcome at SWFC's viewing platform, which at 474 meters above ground is the world's highest closed viewing platform. The Water Cube It was constructed for use during the 2008 Summer Olympics.Now visitors can express surprise at the architecture of the building.They can destroy the indoor atmosphere as well. Among the offerings of the Water Cube are a restaurant and bar, a shopping area, and Water World, a family water park. The Bird's Nest, Beijing It was designed mainly for the 2008 Summer Olympics.It can hold up to 80,000 people and has been used for a winter theme park.Nowadays, its main income is as a tourist attraction.It draws more than 20,000 tourists every day. National Center for the Performing Arts It was completed in 2007.The building is surrounded by a man­made lake, requiring guests to enter via an underground hallway.It is home to an Opera Hall, Music Hall, and Theater. 语篇解读:本文介绍了中国五个著名的现代化建筑。 1.Which of the following buildings was first constructed? A.Beijing International Airport. B.Shanghai World Financial Center. C.The Water Cube. D.The Bird's Nest, Beijing. 解析:选A 细节理解题。通过比较第一部分“The airport was constructed in the 1950s.”第二部分“Completed in 2008, SWFC took over 10 years to complete due to financial shortages and construction delays.”第三部分“It was constructed for use during the 2008 Summer Olympics.”第四部分“It was designed mainly for the 2008 Summer Olympics.”可知北京国际机场是最早建造的。 2.Why was the con

资源预览图

2019全程备考二轮复习高三英语“阅读理解+阅读七选五”组合练 (4份打包)
1
2019全程备考二轮复习高三英语“阅读理解+阅读七选五”组合练 (4份打包)
2
2019全程备考二轮复习高三英语“阅读理解+阅读七选五”组合练 (4份打包)
3
所属专辑
相关资源
由于学科网是一个信息分享及获取的平台,不确保部分用户上传资料的 来源及知识产权归属。如您发现相关资料侵犯您的合法权益,请联系学科网,我们核实后将及时进行处理。