Task3Model2 Requesting to amend LC(同步练习)《外贸商函》高教版(第二版)-同步精品课堂

2024-04-18
| 2份
| 3页
| 83人阅读
| 0人下载

内容正文:

Project 8 Task 3 Model 2 Requesting to amend L/C 同步练习 1、 单选题 1. _____ your L/C arrived earlier, we would have caught the steamer. ( ) A. If B. Should C. Had D. As 2. We have to ask you to _____ the shipment date and the L/C validity ______ 15 days respectively. ( ) A. expand; for B. extend; for C. extent; for D. extend; to 3. There _____ no direct steamer sailing for your port recently, so we have to ship the goods _____ Hong Kong. ( ) A. being; via B. is; via C. is; through D. being; by 2、 词语中英互译 1.修改通知书 2.审核信用证 3.运费到付 4. the captioned L/C 5. execute the shipment 6. instead of 三、句子中英互译 1. 请延长装运期至11月20日,因为对我方来说,很难在10月28日前进行装运。 2. 请把信用证修改成“允许分批装运”,而不是“禁止分批装运”。 3. Please note that we have drawn on you for this amount at 30 days D/A and passed the draft attaching full set of shipping documents to our banker. 原创精品资源学科网独家享有版权,侵权必究! 学科网(北京)股份有限公司 $$ Project 8 Task 3 Model 2 Requesting to amend L/C 同步练习答案 1、 单选题 1. _____ your L/C arrived earlier, we would have caught the steamer. ( ) A. If B. Should C. Had D. As 答案:C 2. We have to ask you to _____ the shipment date and the L/C validity ______ 15 days respectively. ( ) A. expand; for B. extend; for C. extent; for D. extend; to 答案:B 3. There _____ no direct steamer sailing for your port recently, so we have to ship the goods _____ Hong Kong. ( ) A. being; via B. is; via C. is; through D. being; by 答案:B 2、 词语中英互译 1.修改通知书 答案:amendment advice 2.审核信用证 答

资源预览图

Task3Model2 Requesting to amend LC(同步练习)《外贸商函》高教版(第二版)-同步精品课堂
1
所属专辑
由于学科网是一个信息分享及获取的平台,不确保部分用户上传资料的 来源及知识产权归属。如您发现相关资料侵犯您的合法权益,请联系学科网,我们核实后将及时进行处理。