内容正文:
Project 8 Task 3 Model 2
Requesting to amend L/C
同步练习
1、 单选题
1. _____ your L/C arrived earlier, we would have caught the steamer. ( )
A. If B. Should C. Had D. As
2. We have to ask you to _____ the shipment date and the L/C validity ______ 15 days respectively. ( )
A. expand; for B. extend; for C. extent; for D. extend; to
3. There _____ no direct steamer sailing for your port recently, so we have to ship the goods _____ Hong Kong. ( )
A. being; via B. is; via
C. is; through D. being; by
2、 词语中英互译
1.修改通知书
2.审核信用证
3.运费到付
4. the captioned L/C
5. execute the shipment
6. instead of
三、句子中英互译
1. 请延长装运期至11月20日,因为对我方来说,很难在10月28日前进行装运。
2. 请把信用证修改成“允许分批装运”,而不是“禁止分批装运”。
3. Please note that we have drawn on you for this amount at 30 days D/A and passed the draft attaching full set of shipping documents to our banker.
原创精品资源学科网独家享有版权,侵权必究!
学科网(北京)股份有限公司
$$
Project 8 Task 3 Model 2
Requesting to amend L/C
同步练习答案
1、 单选题
1. _____ your L/C arrived earlier, we would have caught the steamer. ( )
A. If B. Should C. Had D. As
答案:C
2. We have to ask you to _____ the shipment date and the L/C validity ______ 15 days respectively. ( )
A. expand; for B. extend; for C. extent; for D. extend; to
答案:B
3. There _____ no direct steamer sailing for your port recently, so we have to ship the goods _____ Hong Kong. ( )
A. being; via B. is; via
C. is; through D. being; by
答案:B
2、 词语中英互译
1.修改通知书
答案:amendment advice
2.审核信用证
答